MUHAMMAD HAZIM PD HJ HAZAIR

SENIOR PROCESS ENGINEER
NO 9, SPG 1094, KG SALAMBIGAR, JLN MUARA, BRUNEI DARUSSALAM

Summary

Accomplished Process Engineer with over [11+] years of experience ensuring compliance and enhancing processes to achieve objectives. Successful and motivated professional dedicated to strategic planning and results-driven work. Proven track record of optimizing operations and implementing innovative solutions to drive efficiency and productivity. Strong analytical skills and attention to detail, consistently delivering high-quality results in fast-paced environments.

Overview

12
12
years of professional experience
9
9
years of post-secondary education

Work History

Process Engineer

PETROKON UTAMA SDN BHD
08.2024 - Current
  • Title: OEP1203 – Salman Project Support (SALMAN WI Pipeline Replacement Study)
  • Activities involved: Simulations Modelling for Steady State and Transient Surge Calculation, PIPENET Steady State and Transient Surge Modelling and Simulation Runs.
  • Preparation of Reports, Surge calculation report.
  • Title: CGP905 – BSM Aviation Fire Fighting Network Upgrade (Detailed Design)
  • Activities involved: Simulations Modelling for Steady State and Transient Surge Calculation, PIPENET Steady State and Transient Surge Modelling and Simulation Runs.
  • Pump Sizing Calculation, NPSH Adequacy check for existing pumps, NPSHA Calculation for New Jockey Pump.
  • FW Tank Sizing, Open Vent Sizing, Tank Sizing based on API650 and NFPA.
  • Preparation of Report, Steady State and Transient Report.
  • UEFS/UFS/USFS Preparation, UEFS development (IFC/IFA and AFC), UFS/USFS development (IFC/IFA and AFC).
  • Datasheet, Process Input to Datasheet for the following items: 4-Way Hydrants, Restriction Oriffice, Thermal Relief Valves, Top Foam Pourer, Jockey Pump, FW Sprinkler, Foam-Water Monitor.
  • HEMP Workshop, Attend HAZOP Session.
  • Title: BNP1405 – Steam Turbine Rejuvenation Project
  • Activities involved: PEFS/UEFS/PFS/PSFS Preparation, PEFS/UEFS development (IFC/IFA and AFC), PFS/PSFS development (IFC/IFA and AFC), HMB development (IFC/IFA and AFC).
  • Attend KDA for Final Drawing Approval (FDA) for AFC.
  • Title: CGA1401 – BSM Muara AS-BUILT
  • Activities involved: PEFS/UEFS/PFS/PSFS Preparation, PEFS/UEFS development (RAB and IAB), PFS/PSFS development (RAB and IAB).
  • Title: CGP1401 – BSM Muara Tank Decommissioning
  • Activities involved: Simulations Modelling for Steady State and Transient Surge Calculation, PIPESIM Steady State Simulation Runs.
  • Pump Sizing Calculation, NPSH Adequacy check for Hydrocarbon Product existing pumps.
  • Preparation of Report, Steady State and Transient Report.
  • UEFS/UFS/USFS Preparation, UEFS development (IFC/IFA and AFC), UFS/USFS development (IFC/IFA and AFC).
  • Title: CGP1402 – Road Tank Carrier Feasibility Studies
  • Activities involved: UEFS/UFS/USFS Preparation, PEFS development – RLMU for Tie-in Point location based on Options Proposed, PFS/PSFS development RLMU for Tie-in Point location based on Options Proposed.
  • Report Preparation, Option Study and Feasibility Report.
  • Title: OWE1401 – Pipeline Replacement Project
  • Activities involved: UEFS/UFS/USFS Preparation, PEFS development – RLMU for Tie-in Point location based on Options Proposed, PFS/PSFS development RLMU for Tie-in Point location based on Options Proposed.
  • Report Preparation, Option Study and Feasibility Report.

Process Engineer

PETROKON UTAMA SDN BHD
01.2016 - 07.2024
  • Title: CGP501 – STL Diesel Pump Replacement Project
  • Activities involved: Basis for Design (BFD) Report, Concept Selection.
  • Simulations Modelling for Transient Surge Calculation, PIPENET Transient Surge Modelling.
  • FRED Simulation Software, Perform FRED simulation runs for dense gas dispersion.
  • Pump Sizing Calculation, NPSH Adequacy check for procured pumps, NPSHA Calculation.
  • Simulation Modelling for Line Sizing, PIPESIM modelling of Diesel systems, Hydraulic calculation to check velocity, static velocity and momentum criteria, Equivalent length calculation.
  • Preparation of Process Datasheet, Pump Strainer.
  • Attend HAZOP Session, Attend IPF Session.
  • Title: CGP601 – STL Diesel Pump Replacement Project
  • Activities involved: PEFS, PEFS development.
  • Pump Sizing Calculation, NPSH Adequacy check for procured pumps, NPSHA Calculation, NPSHA = NPSHR.
  • Simulation Modelling for Line Sizing, PIPESIM modelling of Diesel systems, Hydraulic calculation to check velocity, static velocity and momentum criteria, Equivalent length calculation.
  • Simulations Modelling for Transient Surge Calculation, PIPENET Transient Surge Modelling.
  • Title: OWW602 – AMDP22 Infill Development
  • Activities involved: Simulations Modelling for Safety Time Calculation, Safety time calculation for HIPPS valves.
  • Title: OWW604 – AMDP22 Infill Development
  • Activities involved: Simulations Modelling for Safety Time Calculation, Safety time calculation for HIPPS valves.
  • Title: OWW605 – AMDP22 Infill Development
  • Activities involved: Simulations Modelling for Safety Time Calculation, Safety time calculation for HIPPS valves.
  • Title: LDP602 – NGCP SCOT COMPRIMATE LINE
  • Activities involved: PEFS, PEFS development.
  • Pump Sizing Calculation, NPSH Adequacy check for existing pumps, NPSHA Calculation.
  • Simulation Modelling for Line Sizing, PIPESIM modelling of NGCP systems, Hydraulic calculation to check velocity, static velocity and momentum criteria, Equivalent length calculation, RO sizing.
  • Simulations Modelling for Transient Surge Calculation, PIPENET Transient Surge Modelling.
  • Title: SH1604 – Provision of turn-key project for new piping at BSM Muara
  • Activities involved: Simulation Modelling for Line Sizing, PIPESIM modelling of AGO-A/B, MOGAS-A/B and Saraline systems, Hydraulic calculation to check velocity, static velocity and momentum criteria, Equivalent length calculation.
  • Title: CGP701 – BSM Muara Gantry Project
  • Activities involved: Simulations Modelling for Transient Surge Calculation, PIPENET Transient Surge Modelling.
  • Title: LHP606 – SCOT Process Engineering Support
  • Activities involved: DARAT PIMS Surge Studies, Simulations Modelling for Transient Surge Calculation (Pre-PIMS), PIPENET Transient Surge Modelling.
  • Simulations Modelling for Transient Surge Calculation (Post-PIMS), PIPENET Transient Surge Modelling.
  • Preparation of Reports, Surge calculation report.
  • EMOC4028 – Surge Study from CPRP11, MGPP01 to SCOT CDU Tank T-150 (Old MOL Line), Simulations Modelling for Transient Surge Calculation, PIPENET Transient Surge Modelling and Safety Time Calculation.
  • Preparation of Reports, Surge calculation report, Safety time calculation report.
  • EMOC4029 – Surge Study from AMPA Line 1 to SCOT CDU Tank T-160, Simulations Modelling for Transient Surge Calculation, PIPENET Transient Surge Modelling and Safety Time Calculation.
  • Preparation of Reports, Surge calculation report, Safety time calculation report.
  • EMOC4030 – Surge Study from AMPA Line 2 to SCOT CDU Tank T-160, Simulations Modelling for Transient Surge Calculation, PIPENET Transient Surge Modelling and Safety Time Calculation.
  • Preparation of Reports, Surge calculation report, Safety time calculation report.
  • EMOC4160 – Surge Study from CPRP11, MGPP01 to SCOT CDU Tank T-150 (New MOL Line), Simulations Modelling for Transient Surge Calculation, PIPENET Transient Surge Modelling and Safety Time Calculation.
  • Preparation of Reports, Surge calculation report, Safety time calculation report.
  • Title: LHP703 – HP CAT 1 and 2 PIMS Project
  • Activities involved: PEFS, PEFS development.
  • Attend Safety Desktop Review, Close out Safety Desktop Review Report.
  • Title: BNP214 – U-5700/5900 IA/N2 Supply Unit
  • Activities involved: Variable Table, Generate Variable Table for IA U-5700 Unit, Generate Variable Table for N2 U-5900 Unit.
  • Attend Variable Table Session – U-5700.
  • Title: BNP404 – B.O.G N2 Back Up Supply
  • Activities involved: PEFS, PEFS development (AFC), Vendor Drawings Review.
  • Title: OEP804 – SALMAN Brownfield Scope (Conceptual Design)
  • Activities involved: PEFS/UEFS/PFS/PSFS, PEFS/UEFS development (AFDD), PFS/PSFS development (AFDD), HMB development (AFDD).
  • Simulation Modelling for Line Sizing, UNISIM modelling, Hydraulic calculation to check velocity, static velocity and momentum criteria, Equivalent length calculation, Vent Adequacy Check, Low Temperature Check, Blow down Valve Calculation.
  • Attend HAZID Session, Attend KDA for Final Drawing Approval (FDA) for AFDD.
  • Title: OWP806 – CPRP11 Bulk Metering System (Detailed Design)
  • Activities involved: Vendor Documents Review, Water Cut Meter, Coriolis Meter.
  • Process Calculation Verification, Process Datasheet Verification.
  • Title: OER905 – CPP01/CPP04 PECO Filter (Detailed Design)
  • Activities involved: Vendor Documents Review, PECO Filter, Relief Valves, Level Control Valves, Pressure Control Valves.
  • Process Calculation Verification, Process Datasheet Verification.
  • Title: BNP904 – U-4200 De-bottlenecking Project (Process Safety Scope) (Detailed Design)
  • Activities involved: Simulation Modelling for Line Sizing, UNISIM modelling, Hydraulic calculation to check velocity, static velocity and momentum criteria, Control Valve Sizing.
  • Preparation of Process Datasheet, Control Valves.
  • Title: OEP910 – SALMAN Brownfield Scope (Detailed Design)
  • Activities involved: PEFS/UEFS/PFS/PSFS, PEFS/UEFS development (IFC/IFA and AFC), PFS/PSFS development (IFC/IFA and AFC), HMB development (IFC/IFA and AFC).
  • Attend KDA for Final Drawing Approval (FDA) for AFC.
  • Title: SE1901 – SALMAN Greenfield Scope (Detailed Design)
  • Activities involved: Simulations Modelling for Transient Surge Calculation, PIPENET Transient Surge Modelling and Safety Time Calculation.
  • Pump Sizing Calculation, NPSH Adequacy check for existing pumps, NPSHA Calculation.
  • Relief Valve Sizing, Blocked Outlet, Reverse Flow.
  • Title: OWR1001 – PID0034 Surge Studies
  • Activities involved: Simulations Modelling for Transient Surge Calculation, PIPENET Transient Surge Modelling and Safety Time Calculation.
  • Preparation of Reports, Surge calculation report, Safety time calculation report.
  • Title: BNP905 – U-4200 De-Bottlenecking Project (Remaining Scope) (Detailed Design)
  • Activities involved: Simulation Modelling for Line Sizing, UNISIM modelling, Hydraulic calculation to check velocity, static velocity and momentum criteria, Control Valve Sizing.
  • Vendor Document Review, Control Valves, P-4218A/B, P-4217A/B.
  • PEFS/UEFS/PFS/PSFS Preparation and Updation, PEFS/UEFS development (IFC/IFA and AFC), PFS/PSFS development (IFC/IFA and AFC), HMB development (IFC/IFA and AFC).
  • Title: BI2001 – Design Review & Consultancy Services On Serviceability Of Cooling Water Towers for BFI
  • Activities involved: Simulations Modelling for Steady State and Transient Surge Calculation, PIPENET Steady State and Transient Surge Modelling and Simulation Runs.
  • Preparation of Reports, Surge calculation report.
  • Title: OWP1005 – AMPA09 HP Cascade Project (Conceptual Design)
  • Activities involved: Simulations Modelling for Steady State, UNISIM SS model development of AMPA09 LP Network, UNISIM SS runs for various forecast cases and generation of process data, Slug data for vibration study, Flowline Sizing.
  • Low Temperature Study, Low Temperature Study and Hydrate Inhibitor Injection Rate Estimation, Vent Calculation, Vent Line Hydraulics.
  • Closed Drain Calculation, Drain Line Sizing using Manning Formula and Froude Number (for Horizontal/Vertical Closed Drains).
  • RV Sizing, Sizing of RV Criteria to multiple well system using new BSP standard (based on Fault Tree Analysis, Risk Reduction Factor from LOPA, Probability of Failure on Demand of Electronic/Pneumatic SIF).
  • Title: LHP1101 – SCOT Surge Study On SLLG
  • Activities involved: Simulations Modelling for Transient Surge Calculation, PIPENET Transient Surge Modelling and Safety Time Calculation.
  • Title: LHP1003 – Firewater System Upgrade 12” FW Header (Detailed Design)
  • Activities involved: Simulations Modelling for Steady State Calculation, PIPENET Steady State Simulation Modelling and Runs, Hydraulic Calculation to check velocity, static velocity and momentum criteria.
  • PEFS/UEFS/PFS/PSFS Preparation, PEFS/UEFS development (IFC/IFA and AFC), PFS/PSFS development (IFC/IFA and AFC), HMB development (IFC/IFA and AFC).
  • HEMP Workshop, Attend Design HAZID Session, Attend KDA for Final Drawing Approval (FDA) for AFC.
  • Title: CGP905 – BSM Muara Fire Fighting Network Upgrade (Detailed Design)
  • Activities involved: Simulations Modelling for Steady State and Transient Surge Calculation, PIPENET Steady State and Transient Surge Modelling and Simulation Runs.
  • Pump Sizing Calculation, NPSH Adequacy check for existing pumps, NPSHA Calculation for New Jockey Pump.
  • Preparation of Report, Steady State and Transient Report.
  • UEFS/UFS/USFS Preparation, UEFS development (IFC/IFA and AFC), UFS/USFS development (IFC/IFA and AFC), Datasheet, Process Input to Datasheet for the following items: 4-Way Hydrants, Restriction Oriffice, Thermal Relief Valves, Top Foam Pourer, Jockey Pump, FW Sprinkler, Foam-Water Monitor.
  • HEMP Workshop, Attend HAZOP Session.
  • Title: BNP1110 – Loading Arm Replacement Project (Detailed Design)
  • UEFS/UFS/USFS Preparation, UEFS development.
  • Title: OEP1203 – Salman Project Support (WIM Pump Surge Study)
  • Activities involved: Simulations Modelling for Steady State and Transient Surge Calculation, PIPENET Steady State and Transient Surge Modelling and Simulation Runs.
  • Preparation of Reports, Surge calculation report.
  • Title: SH2101 – BSM Muara FW Pump Control Upgrade (Detailed Design)
  • Activities involved: UEFS/UFS/USFS Preparation, UEFS development (IFC/IFA and AFC).
  • Title: LHP1202 – PRP10 Pipeline FW Replacement Project (Detailed Design)
  • Activities involved: Simulations Modelling for Steady State Calculation, PIPENET Steady State Simulation Modelling and Runs, Hydraulic Calculation to check velocity, static velocity and momentum criteria.
  • PEFS/UEFS/PFS/PSFS Preparation, PEFS/UEFS development (IFC/IFA and AFC), PFS/PSFS development (IFC/IFA and AFC), HMB development (IFC/IFA and AFC).
  • HEMP Workshop, Attend Design HAZID Session, Attend KDA for Final Drawing Approval (FDA) for AFC.

Graduate Process Engineer

PETROKON UTAMA SDN BHD
11.2013 - 01.2016
  • Title: OWP405 – Pipeline De-rating Studies for West Platform
  • Activities involved: PEFS mark up for 25 PIDS for AMPA and Fairley Platforms, Identify pipeline and interconnected upstream/downstream systems in PEFS, Study entire pipeline system to identify upstream/downstream source, Identify if source will lead to overpressure.
  • Title: CGP301 – BSM Loading Gantry
  • Activities involved: Simulation Modelling for Line Sizing, PIPESIM modelling of RON 97, AGO, RON 85, JET-A1 and MTBE systems, Hydraulic calculation to check velocity, static velocity and momentum criteria, Equivalent length calculation, PIPENET transient modelling for RON 97, AGO, RON 85, JET-A1 and MTBE systems.
  • Pump Sizing Calculation, NPSH Adequacy check for existing pumps (RON 85, JET-A1 and MTBE), NPSHA Calculation, NPSHA = NPSHR.
  • Vent System Calculation, Aspen FLARENET modelling for vent system at new loading gantry, Hydraulic calculation to check Pressure, Mach No., Noise level and Line size, Flame Arrestor Sizing, Bursting Disc Sizing, Knock-out pot sizing, PVV Adequacy Check for RON 97 and RON 95 Tanks, Inventory calculation for TERVs (Thermal Relief Valves), Property generation using HYSYS.
  • Fire Protection Studies, PIPENET Sprinkler System modelling.
  • Hydraulic calculation to check velocity, momentum, static velocity criteria, Hydraulic calculation to check line size adequacy, Foam-water demand calculation, Calculation of sprinkler system coverage area, Calculation of number of nozzle required for the sprinkler system, Identify location of new fire-water monitor as per DEP.
  • Preparation of Process Datasheet, Loading Arms and Vapour Return Line, Pumps, Automatic Re-circulation Valve, Jet-A1 Filter, Pump Strainer, Bucket Type Strainer, PVRV, Spray Nozzle, TERV, Flame Arrestor, Fire Monitors, Bursting Discs.
  • Preparation of Reports, Vent System Report, Pump Sizing and Line Hydraulics Report, Fire Protection Study Report.
  • Attend HAZOP Session, Attend IPF Session.
  • Title: LDP501 – RASAU Operations Improvement
  • Activities involved: Simulations Modelling for Transient Surge Calculation, PIPENET Transient Surge Modelling, Fine tuning control parameters of PCV (PID) to reduce impact of surge and vibrations in pipeline, Simulate actual operating condition at site to induce vibration and high surge pressure in system.
  • Preparation of Reports, Surge calculation report.
  • Title: LDP501 – DARAT Pipeline Replacement Project PRP5
  • Activities involved: Simulations Modelling for Transient Surge Calculation, PIPENET Transient Surge Modelling, Fine tuning control parameters of PCV (PID) to reduce impact of surge and vibrations in pipeline, Simulate actual operating condition at site to induce vibration and high surge pressure in system.
  • Preparation of Reports, Surge calculation report.
  • Title: LDP502 – DARAT Pipeline Replacement Project PRP5
  • Activities involved: Simulations Modelling for Transient Surge Calculation, PIPENET Transient Surge Modelling, Fine tuning control parameters of PCV (PID) to reduce impact of surge and vibrations in pipeline, Simulate actual operating condition at site to induce vibration and high surge pressure in system.
  • Preparation of Reports, Surge calculation report.
  • Title: LDP507 – RASAU Compressor Upgrade
  • Activities involved: Relief Valve Sizing/Adequacy Check, Fire Case –Wetted/Un-wetted, Blocked Outlet, Reverse Flow.
  • Blow Down Valve Calculation, Inventory Calculation, Perform Blow Down Inventory calculation using UNISIM software.
  • Separator Sizing Calculation, Determine separator type (Vertical vs Horizontal), Determine separator liquid level map for level control application.

Education

B.Eng. (Hons) - Mechanical Engineering

University of Bradford
01.2011 - 01.2013

B.Eng - Mechanical Engineering

Curtin University of Technology
01.2008 - 01.2011

BTEC National Diploma - undefined

Mechanical Engineering
01.2004 - 01.2007

BTEC Pre-National Diploma -

Mechanical Engineering
01.2002 - 01.2003

Skills

PIPENET

PIPESIM

ASPEN HYSYS

UNISIM

Aspen FLARENET

FRED

Instrument Calculations

undefined

External Training

  • Alarm Rationalization Presentation, 03/01/14
  • Certified Equipment for Hazardous Area Awareness, 09/01/14
  • Flow Assurance for Oil and Gas Production System, 09/01/14
  • Variable Table Training, 10/01/15
  • Report Writing Training, 09/01/17
  • End to End Training, 10/01/17
  • What is useful in updated version of UniSim, 01/01/18
  • What is useful in the new version of UniSim, refresher on dynamic simulations, and sorting out queries listed by the team, 09/01/19
  • PIPENET Training – Spray/Sprinkler Module, 09/01/20
  • What is useful in the new version of UniSim, refresher on dynamic simulations, and sorting out queries listed by the team, 12/01/20

Personal Information

  • Date of Birth: 03/17/87
  • Nationality: Bruneian

Training

  • Technical Report Writing for Engineers, 09/01/17
  • How To Do Estimation For the BSP Project, 09/01/17
  • End to End Training, 10/01/17
  • Lessons Learnt from Inaccurately Selected Tie-In Points, 08/01/18
  • Understanding the HAZOP process, and preparing for the effective participation and action closeouts + HAZOP way of thinking while designing, 11/01/18
  • Preparation of Schedule of Source of Release for WTI Projects, 05/01/18
  • Managing the Detailed Design Changes to avoid inconsistencies and rework, 07/01/19
  • Root Cause Analysis, Tools and Methodology, 10/01/19
  • Representative Modelling Using the Process Engineering Software For Conclusive Result Interpretation, 07/01/20
  • Awareness for EMS ISO 14001:2015, 08/01/20
  • IPF Study - Providing the Process Engineering Inputs for IPF Studies, and Attending Those Affectively, 10/01/21
  • PIPENET External Training, 03/01/25

Activities

Participated in ASEAN Skills competition in Auto Desk Inventor (2007)

Timeline

Process Engineer

PETROKON UTAMA SDN BHD
08.2024 - Current

Process Engineer

PETROKON UTAMA SDN BHD
01.2016 - 07.2024

Graduate Process Engineer

PETROKON UTAMA SDN BHD
11.2013 - 01.2016

B.Eng. (Hons) - Mechanical Engineering

University of Bradford
01.2011 - 01.2013

B.Eng - Mechanical Engineering

Curtin University of Technology
01.2008 - 01.2011

BTEC National Diploma - undefined

Mechanical Engineering
01.2004 - 01.2007

BTEC Pre-National Diploma -

Mechanical Engineering
01.2002 - 01.2003
MUHAMMAD HAZIM PD HJ HAZAIRSENIOR PROCESS ENGINEER